Project Brief

The project required the construction of a double storey marina administration facility and included under croft boat repair and workshop facilities, office accommodation with internal partitioning, and with male, female and disabled ablution and change room amenities.



Project Description

The project was completed using composite building materials, including a concrete slab, structural steel framing, besser concrete block walls, metal roofing, aluminium windows, internal partitioning and feature timber gables and eave linings. The project required careful management and control of public access to the construction site which was located adjacent to a water way and public thoroughfare.