Explore the Shelford Group websites: Shelford First | Shelford Quality Homes | Shelford Exclusive Homes | Shelford Commercial

Project Details

Office Accommodation and Warehouse - Lot 1038 Hoyle Road, Hope Valley

Project Brief

The project involved the construction of a largely steel portal warehouse, incorporating dado panels for the storage and manufacture of mining materials, with a large office to the frontage. Due to flammable nature of the materials required to be stored inside, a full ring main hydrant system and a comprehensive sprinkler system incorporating both diesel pumps and full capacity tanks were installed with full fire brigade monitoring.



Project Description

The project comprised the construction of a two-story office facility of 360m2and a warehouse area of 3,800m2 with the additional incorporation of a manufacturing area enclosed behind rapid rise doors for dust control. A substantial canopy provided sheltered access for loading and unloading facilities. The office accommodation featured aluminium louvres to control the solar intensity on the western perimeter, necessary to address energy efficiency requirements.