Frederick Irwin Anglican School – Halls Head

Industrial Warehouse & Cold Storage Facility

Project Details

Industry
Education
Client
AngliSchools
Location
Lot 98 (#28) Karon Vista, Halls Head WA 6210
Architect
Marocchi Engineering Group
Contract Value
$3,299,300+ GST
Completion
16 December 2024

Overview

Project Overview

The AngliSchools administration block and classroom expansion is a standout example of education projects in Perth, designed to provide modern, functional learning spaces while enhancing staff and student facilities. The project delivered a contemporary administration block and four new classrooms, supporting the school’s growing needs.

This expansion project was developed to enhance the learning environment and administrative operations at AngliSchools. Key aspects include:

  • A new single-storey administration block with reception, offices, and staff facilities

  • Four modern classrooms designed for flexible learning

  • Contemporary architectural design using steel finishes, timber cladding, and red face brick to complement existing buildings and the natural environment

  • Strategic window placement and glazed internal partitions to maximize natural light and create open, welcoming spaces

The facility integrates modern design, sustainability, and practicality to create a safe, functional, and inspiring environment for students, staff, and visitors.

Gallery

Project Gallery

Delivery

Project Delivery

Key Features

  • Administration & Classroom Facilities: New offices, staff and student toilets, and four classrooms with flexible layouts

  • Architectural Finishes: Combination of steel, timber, and brickwork for a contemporary and natural aesthetic

  • Sustainable Design: Maximized natural lighting to reduce energy usage, feature timber-clad gable, and illuminated signage

  • External Spaces: Light-colored exposed aggregate footpaths, timber rafters, and a nature playscape with logs, recycled materials, and UV-resistant shade sail for safe outdoor play

  • Interior Finishes: Acoustic-rated metal strip ceilings, linear HVAC diffusers, timber-look flooring, custom joinery, feature track lighting, and breakout spaces

Construction Challenges

Delivering this project required careful planning and coordination due to its live school environment:

  1. Working in a Live Environment: Ensuring safety for students and staff while maintaining school operations, including pedestrian management, traffic exclusion zones, and emergency access plans.

  2. Child Safety & Compliance: All personnel underwent Working With Children checks, and additional safety protocols were implemented, including site safety walks, egress point checks, and extended exclusion zones.

  3. Restricted Access & Logistics: Located in a residential, high-traffic area, deliveries and construction schedules were coordinated to avoid school drop-off/pick-up times and minimize disruption to the community.

Despite these challenges, the project was delivered on time and provides a safe, functional, and visually striking facility for the school community.

Portfolio

Related Projects

Ready to Build With Confidence?

Whether you're planning an industrial facility, commercial development or community project, our experienced team is ready to discuss your project.

Discuss Your Project Download Our Capability Statement
×