Project
City of Gosnells Emergency Operations Centre
Government
Project Details
Overview
Project Overview
Shelford Constructions delivered the City of Gosnells Emergency Operations Centre, a purpose-built government facility providing an operational base for local State Emergency Services and Bush Fire Brigade personnel.
Designed around the practical requirements of emergency response organisations, the centre brings together office and control room accommodation with dedicated garaging for emergency appliances, plant and equipment. The integrated layout provides the infrastructure required to support personnel, vehicles and operational activities from a central facility.
The building incorporates a combination of concrete tilt panels, masonry, structural steel framing and metal cladding, creating a robust facility suited to its operational purpose while responding to the architect's design intent.
Specialist external infrastructure includes a vehicle washdown area with an oil separator, together with hardstand runoff catchments designed to filter surface pollutants before entering the drainage system.
Construction required substantial earthworks due to existing ground conditions, including the removal of clay and replacement with certified clean fill. The site's proximity to the surrounding river system also introduced stringent environmental requirements, requiring careful controls throughout construction.
The completed development demonstrates Shelford Constructions' experience delivering government and emergency services infrastructure where operational functionality, environmental management and durable construction are critical to project success.
Gallery
Project Gallery
Delivery
Project Delivery
Scope of Works
Shelford Constructions delivered a purpose-built emergency operations facility incorporating:
- Emergency operations centre
- Office accommodation
- Control room facilities
- SES operational areas
- Bush Fire Brigade operational areas
- Garaging for emergency appliances
- Plant and equipment storage
- Vehicle washdown facilities
- Oil separator
- Hardstand areas
- Surface runoff management
- Volunteer car parking
- Retaining walls
- Extensive earthworks
- Associated civil and external works
Key Features
Emergency Operations Infrastructure
The centre was purpose-built to support the operational requirements of both the State Emergency Services and Bush Fire Brigades.
Office and control room facilities provide dedicated spaces for personnel and operational coordination, while adjoining garaging accommodates emergency vehicles, appliances, plant and equipment.
Vehicle Washdown & Runoff Management
Specialist infrastructure was incorporated to manage the cleaning of emergency vehicles and equipment.
The vehicle washdown area includes an oil separator, while hardstand runoff is directed through catchment and drainage infrastructure designed to filter surface pollutants.
Durable Building Construction
The building incorporates a composite construction methodology using:
- Concrete tilt panels
- Masonry
- Structural steel framing
- Metal cladding
The combination provides a durable structure suited to the operational demands of an emergency services facility.
Site & External Works
The sloping site required brick and block retaining walls, while bitumen car parking with line marking provides dedicated parking for volunteers and facility users.
Construction Challenges
Extensive Ground Remediation
Existing ground conditions required substantial earthworks before construction could progress.
Clay material was removed from the site and replaced with certified clean fill, providing appropriate ground conditions for the development.
Environmentally Sensitive Location
The proximity of the site to the surrounding river system resulted in stringent environmental controls throughout construction.
Shelford coordinated with an on-site environmental engineer to manage the project's environmental requirements and reduce the risk of construction activities affecting the surrounding environment.
Dieback Management
Dieback controls were also required throughout construction.
Vehicle and personnel washdown procedures were implemented as part of the site's environmental management measures, requiring ongoing coordination of site access and construction activities.