Kingsway Little Athletics Club Facility

Industrial Warehouse & Cold Storage Facility

Project Details

Industry
Government, Sports & Recreation
Client
City of Wanneroo
Location
Kingsway, Madeley WA
Architect
Site Architecture Studio
Contract Value
$680,000 + GST

Overview

Project Overview

This project was for the construction of additional club amenities for utilisation by club members and sporting participants and included a purpose built kitchen and first aid facilities to accommodate large quantities of patrons during peak sporting seasons, meeting and conference rooms and storage facilities for varieties of sporting equipment with additional drive thru access for free movement of equipment.

Gallery

Project Gallery

Delivery

Project Delivery

Key Features

Walls are red face brick with bronze anodised aluminium frames with metal clad doors, metal roofing and steel cladding, and ramped access to sports oval.
Mechanical, electrical and hydraulic services, as well as, structural steel construction were part of the scope.

Construction Challenges

The location of the site was on an embankment which resulted in issues arising with the levels not connecting. These issues were resolved and the finished external areas allowed for ease of access and correct water drainage.
Public access control was required during construction (fencing, hoarding, signs) due to use of sporting fields, as well as, traffic management at specific stages of the project to minimize disruption of nearby operations.
Safety of personnel, subcontractors and public in general was paramount, so stringent OHS documenting and reporting protocols were implemented throughout the duration of the works.

Portfolio

Related Projects

Ready to Build With Confidence?

Whether you're planning an industrial facility, commercial development or community project, our experienced team is ready to discuss your project.

Discuss Your Project Download Our Capability Statement
×

    Download Our Capability Statement

    Complete the form below to receive our latest Capability Statement.